Power and carbon

We propose fuel cells and batteries for 4.8 MW of computing (IT load), followed by a 9.6 MW first node. The halls would need reliable power year-round. The carbon comparison below shows the cost of using gas.

01

Proposed supply: fuel cells first

We propose modular natural gas fuel cells immediately next door to Central Hudson's existing regulator parcel at East Strand's eastern end. Separate batteries (BESS) and electrical distribution would sit on flood-resilient platforms. Utility capacity, environmental review, setbacks, and permits would decide whether this could proceed. No adjoining parcel is identified as a project site.

Fuel cells alone would provide base generation, without combustion stacks. They convert natural gas to electricity through a chemical reaction. They would run quietly, with very low local NOx and particulates, and produce usable heat.

Redwood Materials is our preferred storage supplier. We intend to use Redwood Energy second-life EV battery storage, subject to procurement, engineering, and agreement. No partnership or capacity is confirmed. Redwood also offers new batteries; the pack mix would need agreement.

Storage could buffer short power peaks and bridge brief interruptions (ride-through). Controls would schedule charging and discharge (dispatch). Operating apart from the grid (islanding) would depend on inverters, protection, controls, and system testing. We guarantee neither black start nor uptime. No storage size or carbon savings is proposed.

The BESS would be separate from fuel cells or any linear-generator equipment studied. Platforms would meet the engineered design flood elevation. Fire access, separation distances, emergency response, and local approvals would shape the layout. Engineering would check applicable NFPA 855 and UL requirements, including UL 9540 system certification and UL 9540A fire-test evidence. No product certification or site compliance is confirmed.

A screened waterfront from the first phase

A continuous row of narrow, colorful Nyhavn-inspired brick and timber gables would screen the eastern energy center as well as computing and cultural areas from the creek and public promenade. Screening would start with Phase 1 generation and separate Redwood BESS, not wait for the final district. Fuel cells remain the base case; any Mainspring candidate would need separate review.

The energy frontage would use independent architectural screens or separated buildings where engineering allowed. Occupied restaurants and galleries would not share hazardous equipment enclosures. Secure service access would come from the landward side. Independent engineered ventilation and exhaust, acoustic mitigation, flood resilience, fire separation, emergency access, and equipment replacement clearances would set the design. Screens must not obstruct those needs or public access. Actual parcel depth, setbacks, survey, and permits would decide what could fit; no surveyed footprint is proposed.

Public factRedwood Energy is Redwood Materials' storage platform. Its official page lists new and repurposed batteries, Pack Manager integration, monitoring, and dispatch controls. Checked November 26, 2026. These are supplier statements, not Kingston specifications.

Grid supply would be studied in parallel through Central Hudson's normal processes. No combustion-engine base generation would be proposed.

UnverifiedCentral Hudson would need to study gas capacity and service terms after a formal request. Counsel and agencies would need to check air permits, state climate law, and Public Service Commission rules. Neither review has happened.

01a

Generation options to compare

We would compare options against the same load, reliability needs, flood constraints, noise limits, and permit rules. Fuel cells remain the proposed base case. This comparison selects no alternative supplier.

Qualitative options for engineering review. No capacity, efficiency, price, or carbon savings is assigned to an unverified option.
OptionWhat we would checkStatus
Grid supply with storageFirm capacity, connection timing, outage protection, and marginal emissionsUtility studies required
Natural gas fuel cells with storageFuel service, direct and lifecycle emissions, useful heat, noise, and maintenanceProposed base case; no supply agreement
Linear generators with storageOfficial equipment data, fuel use, emissions, heat recovery, starts, noise, and permitsComparison only; no verified project specification

Linear-generator performance would need its own official evidence. The fuel-cell carbon range and heat-flow assumptions would not apply to it. Storage would be engineered separately for each option.

02

Cooling without the creek

Compute halls would extend westward only where actual land depth and setbacks allowed. Automated Dutch glasshouses would screen them and use recovered heat. CO2 could be used only after its source, purity, and food-safety controls qualified. Narrow colorful gabled restaurants and galleries, a continuous stone public walk, and historic boats would follow the creek frontage westward. Modest partner-led furnished corporate residences would sit on the hillside across East Strand. A proposed passenger ferry pavilion would join the public promenade, subject to landing rights and marine review.

Each hall would have full-load independent closed-loop cooling. Dry coolers could send all its heat to air on the hottest day, even with no heat customers.

No creek withdrawal or discharge is planned. Rondout Creek would not be used for cooling water.

03

Natural gas from Central Hudson

Public factCentral Hudson Gas & Electric is the regulated utility serving Kingston. A NYSDEC fact sheet (October 2017) describes its Kingston Gas Works regulator station on North Street, 1.61 acres. The 2025 tax roll records the parcel as 298–322 Rear East Strand.

Being next to gas infrastructure does not establish available capacity, firm service or any agreement. No request or agreement exists.

Gas fuel cells would emit more carbon per MWh than the historical upstate grid average.

04

The carbon figures

The comparison uses a natural gas fuel-cell range from Bloom Energy's white paper. It is manufacturer-published and does not describe any selected supplier. The historical upstate grid average comes from US EPA eGRID 2023 summary data.

Neither figure is a measurement of this proposal.

Direct emissions in lb CO₂ per MWh. Annual metric tons assume 90% average load and PUE 1.15. These are illustrations, not forecasts.
SupplyRate (lb CO₂/MWh)4.8 MW pilot, t/yr9.6 MW first node, t/yr
Fuel cells on natural gas (direct)679–83313,400–16,40026,800–32,900
Upstate NY grid, historical eGRID average2414,8009,500

Gas fuel cells would emit about three times the historical upstate grid average per MWh on these figures.

Direct and lifecycle emissions. Both figures cover direct operating emissions. Upstream methane leakage and equipment manufacture would raise the fuel-cell lifecycle figure.

Average and marginal emissions. eGRID gives an average. Additional demand is served by marginal generation, often gas plants, whose rate can be much higher. We would publish both comparisons.

Limits of heat reuse. Recovered heat could replace some boiler fuel elsewhere, but would not close the carbon gap above. We make no clean, carbon-neutral, or net gas-reduction claim.

05

A path to lower-carbon supply

We would publish a path toward lower-carbon power, with each step checked against measured emissions. Grid supply could grow as capacity allowed and the upstate grid became cleaner. Verified, permitted renewable or biogenic fuel blends could be considered.

We could contract for new renewable generation where it added supply, and use fuel cells able to take lower-carbon fuels.

05a

Using batteries again before recycling

We intend to give suitable EV battery packs a second use in stationary storage. Redwood would need to verify pack condition, usable energy, and replacement plans. Its Pack Manager coordinates different packs.

The procurement review would cover maintenance and eventual recycling. A second use would not establish carbon savings by itself. We would need a lifecycle assessment before making any such claim.

06

Emissions, methane and noise

We would publish direct CO₂ and NOx, methane-leakage estimates including upstream losses, and fence-line sound readings. The wastewater plant could buy heat and backup power. It would not be a district fuel source.

See the energy flows and heat calculator →