The proposal would need answers about sites, utilities, permits, and demand before it could proceed. These are the gaps we know about.
- PowerGas capacityCentral Hudson would need to study service for a pilot with 4.8 MW of computing (IT load) or a 9.6 MW first node, including cost and timing. No formal request or study exists.
- PowerGrid interconnectionCapacity, timeline and upgrades for any grid connection.
- LegalRegulatory thresholdsAir permitting, state climate law, SEQRA review and Public Service Commission jurisdiction over heat or power sales. Requires counsel and agency verification.
- CarbonActual emissionsDirect and lifecycle emissions, upstream methane, and marginal grid rates remain unmeasured for the project. Bloom's manufacturer range is 679 to 833 lb CO2/MWh for gas fuel cells. EPA eGRID 2023 reports an upstate average of 241. Neither establishes actual project performance.
- FloodHydraulics & no-riseHydraulic engineering would test raised platforms, floodable space below buildings, and promenade defenses against FEMA and State no-rise requirements.
- SiteSite controlNo site control exists. Parcel availability is not assessed or implied.
- SiteEnvironmental conditionsSoil, groundwater and contamination conditions on any parcel.
- UtilitiesRegulator parcel confirmationThe 298–322 Rear East Strand / North Street match is strong but not confirmed by Central Hudson.
- CityWastewater interestWhether the City would want heat or backup power for the plant at 91 East Strand.
- MarineBarge deliveryChannel depth, bulkhead loads, crane pads and Army Corps / NYSDEC permits.
- FoodChef demandNo chef, school or buyer has committed; greenhouse yields untested.
- CommunityCommunity chargeThe proposed $5 per contracted kW per month depends on contracted capacity that does not yet exist.
- ScaleLater scenariosDemand and studies would need to justify any 16.8, 24, or 42 MW IT step. The 42 MW figure is a study ceiling only.