The place
The waterfront today
The East Strand corridor
The proposal focuses on East Strand along Rondout Creek. Public parcel and flood records are shown without development or acquisition highlights. They give no indication that parcels are available.
Much of the creek edge lies in FEMA's mapped flood hazard area. Buildings would be raised, and the public walk could help protect the frontage if engineering studies allowed.
Public factThe City adopted its Hudson Riverport Implementation Plan for 192 acres of the Rondout waterfront in December 2015. This proposal would follow it.
Public factThe Central Hudson Kingston Gas Works regulator occupies one creekfront parcel (1.61 acres per NYSDEC, October 2017), recorded as 298–322 Rear East Strand in the 2025 tax roll. It is about 0.7 km (0.4 mile) east of the City's treatment parcel at 91 East Strand, measured between parcel centers.
UnverifiedThe parcel match is strong, without Central Hudson confirmation. Gas capacity, connection rights, and equipment locations are unknown. Neighboring parcels would need separate records to be treated as utility property.
Public factThe wastewater plant is municipal infrastructure; the gas facility belongs to the utility. Neither is owned or controlled by this project.
ProposalAny future plan would avoid relying on municipal or utility property unless the owners independently agree.
ProposalWe propose modular natural gas fuel cells immediately next door to Central Hudson's existing regulator parcel at East Strand's eastern end. Separate batteries (BESS) and electrical distribution would sit on flood-resilient platforms. Utility capacity, environmental review, setbacks, and permits would decide whether this could proceed. No adjoining parcel is identified as a project site. The proposed layout stays separate from this existing-conditions atlas. No proposed energy footprint is drawn here.